December 18, 2013, took place a high-precision operation for two 250-ton cranes during construction of the future Centre de Soccer de Montréal. Watch the TVA News report (in French) called: Installer des mégapoutres en plein hiver.
18 December 2013
December 18, 2013, took place a high-precision operation for two 250-ton cranes during construction of the future Centre de Soccer de Montréal. Watch the TVA News report (in French) called: Installer des mégapoutres en plein hiver.
Did you know that we offer technical services including creating lifting plans, ground pressure calculations and feasibility studies?
Learn more about this service